From the start signal to the final sprint on the beach.
Coastal Rowing / Beach Sprint
Signal Lights & Horn
Visual and acoustic start signal. The red/green signal lights are connected in series.
RunnerButtons
Large red finish buttons placed directly on the beach. Each button comes with a permanently attached 15-metre cable and an RJ45 connector.
Starter Hand Controller
RED and START at your fingertips. The starter controls the start procedure using the wired hand controller.
CoastalRowingTimer
The timer connects the start signals, hand controller, finish buttons and timing laptop. It supports up to six finish inputs, with additional controls built directly into the unit.
IMAS RegattaManager
From finish detection to results display.
The timing laptop connects race timing with the full version of IMAS RegattaManager. Start lists, results and race statuses are synchronised across the system.
- Access recorded times directly in the regatta management software
- Enter time penalties before or after the finish
- Update the results display and rankings
- Apply predefined qualification rules once a race is declared official

Transport & preparation
Packed and ready for the next event.
The complete supplied system fits into a single aluminium transport case. Online training and remote support are available with an internet connection.
PDF · System Description and Quick Start Guide · English

Good to know
Questions about the system.
.
The red RunnerButtons are placed directly on the beach. After the final sprint, athletes press their assigned button. Button positions and cable routing are planned to suit the event layout.
The CoastalRowingTimer supports up to six finish-button inputs. We will work with you to determine how many buttons your event requires
Finish events can be assigned automatically when each button is clearly mapped to a lane. Alternatively, recorded button presses can be assigned manually to the correct crew.
The start is triggered by pressing START on the starter hand controller or the timer. The red light switches off, the green light switches on, and the horn and timing system are activated in sync.
Your next event
Let's plan your
Coastal Rowing Beach Sprint event!
Are you planning a regatta or would you like to get to know the system? Together we will clarify which start signals, target buttons, and software functions fit your process.